Projects - Other Applications
 
This project was for Océ Uk Ltd at large printing factory near mansfield. It required the use of a scissor lift to get to the required 4m high. A timber frame was first created to fix the Crystal system to and then the artwork tensioned into place.
This was a 1 month project for Corus Steel on a railway bridge at Redcar. It involved the use of independent health & safety advisors, site surveys, planning and installation. Main problems were access and health & safety as the road had to be closed and marshalls were needed on the track. The Crystal frame was attached directly to the bridge and the 42m artwork then installed.

John E Wrights in Nottingham required 8 seperate pieces of signage, of sizes up to 17m in length, to be fixed at their offices in Nottingham. The use of a elevated platform was needed to reach the required heights.

 